PhD and research proposal Gantt chart maker

Pick a PhD, master's thesis or research proposal timeline, edit the tasks and the months, and download the Gantt chart as a PNG to paste into your proposal.

  • Free, no sign-up
  • Runs in your browser
  • Nothing uploaded or kept

PhD, 3 years (UK / Europe): the chart opens with these rows

  • Literature review: months 1 to 6
  • Research questions and plan: months 4 to 8
  • Training and methods courses: months 1 to 9
  • Ethics approval: months 6 to 8
  • Confirmation / upgrade review: month 12
  • Pilot study: months 10 to 14
  • Main data collection: months 14 to 22
  • Analysis: months 19 to 28
  • Paper 1: draft and submit: months 21 to 26
  • Conference presentation: month 24
  • Paper 2: months 27 to 32
  • Thesis chapters: months 25 to 33
  • Full draft and supervisor feedback: months 32 to 34
  • Revisions and formatting: months 34 to 36
  • Submit thesis: month 36

The editor, with examples for master’s theses and research proposals too, appears here in a moment.

How to use it

  1. Load an example

    Pick a PhD, master's or proposal timeline, or set your own title and length.

  2. Edit the rows

    Rename tasks, move them up or down, and change when they start and how long they last.

  3. Download the chart

    Save it as an image (PNG or SVG) for your document, or as a CSV for Excel.

Free, no sign-up, and nothing leaves your browser.

How to make a Gantt chart for a research proposal

  1. List the work, not the weeks. Write the tasks first: literature review, instrument or protocol, ethics approval, recruitment or fieldwork, data collection, analysis, writing, dissemination.
  2. Give each task a start and a length in months. Honest estimates beat tidy ones. Tasks that depend on one another start after the earlier one ends; the rest can overlap.
  3. Add the milestones that someone else controls: ethics approval, an interim report, a confirmation review, a submission date. They are the points the rest of the chart has to fit around.
  4. Leave slack before every deadline. Approvals, equipment and participants run late more often than they run early.
  5. Check it against the funder or programme timeline, then export it and paste it into the proposal as the work plan.

Research proposal Gantt chart example (12 months)

The same example the chart maker loads. Change any of it to fit your project.

Research proposal work plan, 12 months
TaskWhen
Preparation
Literature reviewMonths 1 to 3
Develop the instrument or protocolMonths 2 to 4
Ethics approvalMonths 3 to 4
Fieldwork
RecruitmentMonths 4 to 5
Data collectionMonths 5 to 8
Milestone: Interim reportMonth 6
Analysis and reporting
AnalysisMonths 8 to 10
Writing the reportMonths 10 to 12
DisseminationMonths 11 to 12

PhD Gantt chart example (3 years)

A three-year PhD in the UK and Europe style. A four-year US or Canadian PhD with coursework and a qualifying exam is also in the examples menu.

PhD timeline, 3 years
TaskWhen
Foundations
Literature reviewMonths 1 to 6
Research questions and planMonths 4 to 8
Training and methods coursesMonths 1 to 9
Ethics approvalMonths 6 to 8
Milestone: Confirmation / upgrade reviewMonth 12
Data and analysis
Pilot studyMonths 10 to 14
Main data collectionMonths 14 to 22
AnalysisMonths 19 to 28
Paper 1: draft and submitMonths 21 to 26
Milestone: Conference presentationMonth 24
Writing up
Paper 2Months 27 to 32
Thesis chaptersMonths 25 to 33
Full draft and supervisor feedbackMonths 32 to 34
Revisions and formattingMonths 34 to 36
Milestone: Submit thesisMonth 36

Mistakes that make a work plan unconvincing

  • Everything starts in month 1. Examiners notice when data collection and analysis overlap completely.
  • No time for approvals. Ethics and data-access approval often sit on the critical path; start them early and show them as milestones.
  • Writing left to the end. Write the methods and literature chapters while the data are being collected.
  • Bars with no names. A task called “Research” tells the reader nothing; name the work the way the proposal does.

Guides that go with it

Frequently asked questions

What is a Gantt chart in a research proposal?

A Gantt chart is a timeline that shows each task of the project as a bar across the months it will take, so a reader can see the order of the work, what overlaps and when each milestone falls. Proposals use it as the work plan: it shows the project is realistic and that you have thought through the sequence.

How do I make a Gantt chart for a PhD?

List the phases of your PhD (literature review, methods and ethics, data collection, analysis, papers, thesis writing), give each task a start month and a length, add the milestones your programme requires such as a confirmation review or qualifying exam, and leave slack before every deadline. The chart maker above starts from an example and lets you change every number.

How long should each phase of a PhD take?

It depends on your field, your programme and your supervisor, so treat the examples as a starting point. Experimental and fieldwork projects usually need more time for data collection, and projects with ethics approval need to start that early because the wait is outside your control. Check the dates your programme sets for milestones and plan backwards from them.

Can I use the chart in my proposal or thesis?

Yes. The chart you make is yours: paste the PNG into your document. The small credit line under the chart is on by default and can be switched off with the checkbox.

Does it save my chart?

Nothing is stored on a server. Use Copy link to get an address that opens with your chart in it, or download the CSV, which opens in Excel or Google Sheets, to keep the data.

Can I use the chart in Word, PowerPoint or Excel?

Download the PNG and insert it as a picture in Word, PowerPoint or Google Docs. Download the SVG if you want a sharp vector image, and the CSV if you would rather build your own chart in Excel from the task list.